Two quotes rarely look alike. One is in euros per tonne, another in dollars per kilogram. One includes freight, another does not. Comparing the headline price is how businesses pick the wrong supplier. This guide explains how a quote-comparison tool can put quotes on the same footing, based on the behaviour documented for our local tool.

This guide describes behaviour documented for our local supplier-quote comparison tool, using its own synthetic example. It describes our own tool, not a statement about any customer machine, business or result. The documentation calls the output a screening aid, not an award decision.

Landed Cost

The documented method is: landed cost equals goods plus freight plus duty. Duty is a flat percentage on goods only. Everything is converted to one base currency at the exchange rates and unit conversions you supply. The tool uses your rates as given and records their date, but does not check them.

The Pack’s Example

The invented request is for 2,000 kg of steel bar and 5,000 bolts. The base currency is USD, with one rate: 1 EUR is 1.10 USD. Unit conversions between kilograms and tonnes are supplied by the user.

  • Alpha quotes in dollars. Goods come to 2,650.00, freight is 150.00 and duty is 0, so landed cost is 2,800.00. Lead time is 20 days and payment terms are 30 days.
  • Beta quotes in euros, steel by the tonne. Goods come to 2,640.00 in dollars, freight is 220.00 (200 euros), duty at 5% is 132.00, so landed cost is 2,992.00. Lead time is 30 days and payment terms are 60 days.

Beta has the lower goods cost, yet is more expensive once freight and duty are included.

Exclusions Are Shown, Not Hidden

  • Gamma is excluded because the 2,000 kg required is below its minimum order quantity of 5,000 for steel bar.
  • Delta is excluded because it gave no quote for the bolts.
  • A quote for an item that is not in the requirements (a washer from Alpha) is listed as ignored.

Each exclusion carries a reason. A supplier does not vanish from the report without explanation.

Weights Are Your Choice

The example weights price at 60, lead time at 25 and payment days at 15. Change them and the ranking can change. Choose them before you look at the results, and write down why.

What Is Not Covered

  • One request, one delivery. No volume tiers, split awards or per-item freight.
  • Duty is the only tax-like cost. No VAT, insurance or financing cost. Payment days are scored but not priced.
  • Quality, risk, reliability and sustainability are not scored. A person must weigh them.

Use

Treat the ranking as a screening aid. Check the rates, the units and the quotes themselves, then talk to the suppliers. The documentation says the output is not an automated supplier choice.